{"schema":"rootz.ai/filing-signals/v1","query":{"ticker":"ORA","limit":50},"count":50,"signals":[{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":76,"context":"ieve its goal of enhancing shareholder value. Changes in U.S. and foreign government policy, including the imposition of or increases in tariffs and changes to existing trade agreements, could have a material adverse effect on global economic conditions and our business, results of operations, prospects and financial condition. Our investments and profitability in battery Energy Storage System (BESS) may be negatively a","filed_date":"2026-02-26","accession":"0001296445-26-000006","full_text":"https://origin.rootz.global/static/filing/0001296445-26-000006.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"strategic_event","strength":100,"match_count":31,"context":"oard Vote  Recommendation |  Page | | |  1 |  Election to our Board of Directors of the eight director nominees |  FOR each of the nominees |  15 | | |  2 |  Advisory vote on the compensation for our named executive officers |  FOR |  34 | | |  3 |  Ratification of the appointment of Kesselman & Kesselman, a member firm of PricewaterhouseCoopers International Limited, as our independent registered public accounting firm","filed_date":"2025-03-27","accession":"0001308179-25-000240","full_text":"https://origin.rootz.global/static/filing/0001308179-25-000240.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"ai_adoption","strength":100,"match_count":13,"context":"ry must pay to the lessor, in order to maintain its lease position, annually in advance, a rental fee until operations are commenced on the leased land.If the project subsidiary fails to pay any installment of royalty or rental when due and if such default continues for a period of fifteen days specified in the lease, for example, after its receipt of written notice thereof from the lessor, then at t","filed_date":"2025-02-27","accession":"0001628280-25-008531","full_text":"https://origin.rootz.global/static/filing/0001628280-25-008531.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":74,"context":"ide little or no deterrence or protection. A cyber-incident, cyber security breach, severe natural event or physical attack on our operational networks and information technology systems could have a material adverse effect on our financial condition, results of operations, liquidity and cash flows.We rely on information technology systems that allow us to create, store, retain, transmit and otherwise process proprietar","filed_date":"2025-02-27","accession":"0001628280-25-008531","full_text":"https://origin.rootz.global/static/filing/0001628280-25-008531.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":17,"context":"n which they are engaged, except where the failure to be so qualified or in good standing or have such power or authority would not, individually or in the aggregate, reasonably be expected to have a material adverse effect on the business, properties, management, financial position, stockholders equity, results of operations or prospects of the Company and its subsidiaries taken as a whole or on the performance by the","filed_date":"2024-12-13","accession":"0001213900-24-108619","full_text":"https://origin.rootz.global/static/filing/0001213900-24-108619.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"strategic_event","strength":100,"match_count":25,"context":"Stock means an Award of shares of Common Stock that is subject to restrictions on transfer for a specified period. |  | |  |  (y) |  Retirement means, unless otherwise defined in an Award Agreement, Separation from Service upon attainment of the applicable retirement age in those countries in which the law determines the retirement age and age 65 in other countries. |  | |  |  (z) |  Section 409A means Section","filed_date":"2024-05-09","accession":"0001437749-24-015749","full_text":"https://origin.rootz.global/static/filing/0001437749-24-015749.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"strategic_event","strength":100,"match_count":60,"context":"Page | | |  Proposal 1 |  |  Election to our Board of Directors of the nine director nominees |  |  FOR each of the nominees |  |  15 | | |  Proposal 2 |  |  Advisory vote on the compensation for our named executive officers |  |  FOR |  |  32 | | |  Proposal 3 |  |  Ratification of the appointment of Kesselman & Kesselman, a member firm of PricewaterhouseCoopers International Limited, as our independent registered publ","filed_date":"2024-03-27","accession":"0001308179-24-000314","full_text":"https://origin.rootz.global/static/filing/0001308179-24-000314.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"ai_adoption","strength":100,"match_count":13,"context":"order to maintain its lease position, annually in advance, a rental fee until operations are commenced on the leased land. 32 [Table of Contents](#toc) If the project subsidiary fails to pay any installment of royalty or rental when due and if such default continues for a period of fifteen days specified in the lease, for example, after its receipt of written notice thereof from the lessor, then at t","filed_date":"2024-02-23","accession":"0001437749-24-005322","full_text":"https://origin.rootz.global/static/filing/0001437749-24-005322.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":69,"context":"o assess it adequately could be delayed. **A cyber-incident, cyber security breach, severe natural event or physical attack on our operational networks and information technology systems could have a material adverse effect on our financial condition, results of operations, liquidity and cash flows.** We rely on information technology systems that allow us to create, store, retain, transmit and otherwise process proprie","filed_date":"2024-02-23","accession":"0001437749-24-005322","full_text":"https://origin.rootz.global/static/filing/0001437749-24-005322.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"strategic_event","strength":100,"match_count":41,"context":"irm of PricewaterhouseCoopers International Limited, as our independent registered public accounting firm for 2023; | | |  3. |  approve, in a non-binding, advisory vote, the compensation paid to our named executive officers; | | |  4. |  approve, in a non-binding, advisory vote, the frequency of the advisory stockholder vote on the compensation of our named executive officers; and | | |  5. |  transact any other busine","filed_date":"2023-03-28","accession":"0001308179-23-000395","full_text":"https://origin.rootz.global/static/filing/0001308179-23-000395.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":17,"context":"n which they are engaged, except where the failure to be so qualified or in good standing or have such power or authority would not, individually or in the aggregate, reasonably be expected to have a material adverse effect on the business, properties, management, financial position, stockholders equity, results of operations or prospects of the Company and its subsidiaries taken as a whole or on the performance by the","filed_date":"2023-03-16","accession":"0001213900-23-020416","full_text":"https://origin.rootz.global/static/filing/0001213900-23-020416.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"ai_adoption","strength":100,"match_count":13,"context":"ain its lease position, annually in advance, a rental fee until operations are commenced on the leased land. &#xa0; 30 [Table of Contents](#toc) &#xa0; If the project subsidiary fails to pay any installment of royalty or rental when due and if such default continues for a period of fifteen days specified in the lease, for example, after its receipt of written notice thereof from the lessor, then at t","filed_date":"2023-02-24","accession":"0001437749-23-004477","full_text":"https://origin.rootz.global/static/filing/0001437749-23-004477.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":29,"context":"r that these facilities will be able to operate profitably. This could lead to future impairments of our property, plant and equipment resulting in economic losses and liabilities, which could have a material adverse effect on our results of operations, financial condition or cash flows. &#xa0; **We may not be able to successfully conclude the transactions, integrate companies, which we acquired and may acquire in the f","filed_date":"2023-02-24","accession":"0001437749-23-004477","full_text":"https://origin.rootz.global/static/filing/0001437749-23-004477.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":17,"context":"n which they are engaged, except where the failure to be so qualified or in good standing or have such power or authority would not, individually or in the aggregate, reasonably be expected to have a material adverse effect on the business, properties, management, financial position, stockholders equity, results of operations or prospects of the Company and its subsidiaries taken as a whole or on the performance by the","filed_date":"2022-11-18","accession":"0001213900-22-073827","full_text":"https://origin.rootz.global/static/filing/0001213900-22-073827.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"strategic_event","strength":100,"match_count":25,"context":"Stock means an Award of shares of Common Stock that is subject to restrictions on transfer for a specified period. |  | |  |  (y) |  Retirement means, unless otherwise defined in an Award Agreement, Separation from Service upon attainment of the applicable retirement age in those countries in which the law determines the retirement age and age 65 in other countries. |  | |  |  (z) |  Section 409A means Section","filed_date":"2022-06-06","accession":"0001437749-22-014303","full_text":"https://origin.rootz.global/static/filing/0001437749-22-014303.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"strategic_event","strength":100,"match_count":58,"context":"irm of PricewaterhouseCoopers International Limited, as our independent registered public accounting firm for 2022; | | |  3. |  approve, in a non-binding, advisory vote, the compensation paid to our named executive officers; | | |  4. |  approve the amendment and restatement of the Ormat Technologies, Inc. 2018 Incentive Compensation Plan to increase the total number of shares underlying options, SARs or other awards t","filed_date":"2022-04-18","accession":"0001308179-22-000242","full_text":"https://origin.rootz.global/static/filing/0001308179-22-000242.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":28,"context":"r that these facilities will be able to operate profitably. This could lead to future impairments of our property, plant and equipment resulting in economic losses and liabilities, which could have a material adverse effect on our results of operations, financial condition or cash flows. &#xa0; **We may not be able to successfully conclude the transactions, integrate companies, which we acquired and may acquire in the f","filed_date":"2022-02-25","accession":"0001437749-22-004440","full_text":"https://origin.rootz.global/static/filing/0001437749-22-004440.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"strategic_event","strength":100,"match_count":27,"context":"of PricewaterhouseCoopers International Limited, as our independent registered public accounting firm for 2021; |  | |  |  3. |  approve, in a non-binding, advisory vote, the compensation paid to our named executive officers; and |  | |  |  4. |  transact any other business that may properly come before the Annual Meeting and any adjournments or postponements thereof. |  | Only stockholders of record at the close of bus","filed_date":"2021-03-25","accession":"0001178913-21-001161","full_text":"https://origin.rootz.global/static/filing/0001178913-21-001161.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":24,"context":"r that these facilities will be able to operate profitably. This could lead to future impairments of our property, plant and equipment resulting in economic losses and liabilities, which could have a material adverse effect on our results of operations, financial condition or cash flows. **&#xa0;** **&#xa0;** 63 [Table of Contents](#toc) &#xa0; **We may not be able to successfully*****conclude the transactions,******&#x","filed_date":"2021-02-26","accession":"0001437749-21-004274","full_text":"https://origin.rootz.global/static/filing/0001437749-21-004274.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":17,"context":"n which they are engaged, except where the failure to be so qualified or in good standing or have such power or authority would not, individually or in the aggregate, reasonably be expected to have a material adverse effect on the business, properties, management, financial position, stockholders equity, results of operations or prospects of the Company and its subsidiaries taken as a whole or on the performance by the","filed_date":"2020-11-19","accession":"0001437749-20-024257","full_text":"https://origin.rootz.global/static/filing/0001437749-20-024257.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"strategic_event","strength":100,"match_count":46,"context":"stricted Stock **means an Award of shares of Common Stock that is subject to restrictions on transfer for a specified period. (y) **Retirement** means, unless otherwise defined in an Award Agreement, Separation from Service upon attainment of the applicable retirement age in those countries in which the law determines the retirement age and age 65 in other countries. (z) **Section 409A** means Section 409A of th","filed_date":"2020-07-06","accession":"0001437749-20-014668","full_text":"https://origin.rootz.global/static/filing/0001437749-20-014668.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"strategic_event","strength":100,"match_count":29,"context":"rm of PricewaterhouseCoopers International Limited, as our independent registered public accounting firm for 2020; |  | |  3. |  approve, in a non-binding, advisory vote, the compensation paid to our named executive officers; and |  | |  4. |  transact any other business that may properly come before the Annual Meeting and any adjournments or postponements thereof. |  | Only stockholders of record at the close of busine","filed_date":"2020-04-22","accession":"0001178913-20-001157","full_text":"https://origin.rootz.global/static/filing/0001178913-20-001157.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"ai_adoption","strength":100,"match_count":15,"context":"pay to the lessor, in order to maintain its lease position, annually in advance, a rental fee until operations are commenced on the leased land. &#xa0; If the project subsidiary fails to pay any installment of royalty or rental when due and if such default continues for a period of fifteen days specified in the lease, for example, after its receipt of written notice thereof from the lessor, then at t","filed_date":"2020-03-02","accession":"0001437749-20-004072","full_text":"https://origin.rootz.global/static/filing/0001437749-20-004072.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":25,"context":"r that these facilities will be able to operate profitably. This could lead to future impairments of our property, plant and equipment resulting in economic losses and liabilities, which could have a material adverse effect on our results of operations, financial condition or cash flows. &#xa0; ***Storage projects that we are operating, currently developing or plan to develop in the future, may operate as \"merchant\" fac","filed_date":"2020-03-02","accession":"0001437749-20-004072","full_text":"https://origin.rootz.global/static/filing/0001437749-20-004072.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"strategic_event","strength":100,"match_count":21,"context":"rm of PricewaterhouseCoopers International Limited, as our independent registered public accounting firm for 2019; |  | |  3. |  approve, in a non-binding, advisory vote, the compensation paid to our named executive officers; and |  | |  4. |  transact any other business that may properly come before the Annual Meeting and any adjournments or postponements thereof. |  | Only stockholders of record at the close of busine","filed_date":"2019-04-02","accession":"0001178913-19-001022","full_text":"https://origin.rootz.global/static/filing/0001178913-19-001022.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":13,"context":"continued shut-down following the recent stop of the lava of the Puna facilities could have an adverse impact on the power plant's electricity generation and availability, which in turn could have a material adverse impact on our business and results of operations. |  | |  |  |  On April 24, 2018, we completed our acquisition of USG. The total cash consideration (exclusive of transaction expenses) was approximately $11","filed_date":"2019-03-01","accession":"0001437749-19-003760","full_text":"https://origin.rootz.global/static/filing/0001437749-19-003760.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":24,"context":"ither the Borrower nor, to the Knowledge of the Borrower and the Ormat Parties, any other party is in breach of any provision of any contract to which the Borrower is a party, which breach could be a Material Adverse Effect. (h) *Litigation*. No action, suit, other legal or arbitral proceeding, or investigation is pending by or before any domestic or foreign court or Governmental Authority or in any arbitral or other fo","filed_date":"2018-06-19","accession":"0001437749-18-012087","full_text":"https://origin.rootz.global/static/filing/0001437749-18-012087.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"strategic_event","strength":100,"match_count":46,"context":"accounting firm for the fiscal year ending December 31, 2018; |  | |  |  3. |  approve the Ormat Technologies, Inc. 2018 Incentive Compensation Plan; |  | |  |  4. |  approve the compensation of our named executive officers on an advisory basis; and |  | |  |  5. |  transact any other business that may properly come before the meeting. |  | Only stockholders of record at the close of business on March 22, 2018 may vote","filed_date":"2018-03-27","accession":"0001178913-18-000972","full_text":"https://origin.rootz.global/static/filing/0001178913-18-000972.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"ai_adoption","strength":100,"match_count":18,"context":"y must pay to the lessor, in order to maintain its lease position, annually in advance, a rental fee until operations are commenced on the leased land. If the project subsidiary fails to pay any installment of royalty or rental when due and if such default continues for a period of fifteen days specified in the lease, for example, after its receipt of written notice thereof from the lessor, then at t","filed_date":"2018-03-16","accession":"0001437749-18-004850","full_text":"https://origin.rootz.global/static/filing/0001437749-18-004850.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":10,"context":"e of additional debt by us. Also, in the absence of favorable financing options, we may decide not to build new plants or acquire facilities from third parties. Any of these alternatives could have a material adverse effect on our growth prospects. We may also need additional financing to implement our strategic plan. For example, our cash flow from operations and existing liquidity facilities may not be adequate to fin","filed_date":"2018-03-16","accession":"0001437749-18-004850","full_text":"https://origin.rootz.global/static/filing/0001437749-18-004850.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"strategic_event","strength":100,"match_count":48,"context":"|  2. |  Ratify the appointment of PricewaterhouseCoopers LLP as the Company's independent registered public accounting firm for fiscal year 2017; and |  | |  |  3. |  approve the compensation of our named executive officers on an advisory basis; |  | |  |  4. |  vote, on an advisory basis, on the frequency of the stockholder vote on the compensation of our named executive officers; |  | |  |  5. |  vote to approve the","filed_date":"2017-04-10","accession":"0001178913-17-001097","full_text":"https://origin.rootz.global/static/filing/0001178913-17-001097.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"ai_adoption","strength":100,"match_count":21,"context":". Initial consideration for the acquisition is $35 million which will be paid at closing and is subject to adjustment in certain cases. Additional contingent consideration will be payable in two installments subject to the achievement of certain performance milestones measured at the end of fiscal years 2017 and 2020. Closing is expected in early 2017. |  | |  |  |  On December 19, 2016, we announced","filed_date":"2017-03-01","accession":"0001437749-17-003516","full_text":"https://origin.rootz.global/static/filing/0001437749-17-003516.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":9,"context":"f additional debt by us. 74 Also, in the absence of favorable financing options, we may decide not to build new plants or acquire facilities from third parties. Any of these alternatives could have a material adverse effect on our growth prospect. We may also need additional financing to implement our strategic plan. For example, our cash flow from operations and existing liquidity facilities may not be adequate to fina","filed_date":"2017-03-01","accession":"0001437749-17-003516","full_text":"https://origin.rootz.global/static/filing/0001437749-17-003516.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"ai_adoption","strength":100,"match_count":20,"context":"ll hold approximately 80% of GB which will be increased to 85% within two years by capital investment agreed upon in the MOU. | | |  |  |  | | |  |  |  Ormats total consideration will be paid in installments in accordance with specific milestones, including production milestones, expected to be achieved in the next few years. Closing is expected by May 2016 and the transaction is expected to be immed","filed_date":"2016-02-26","accession":"0001437749-16-026139","full_text":"https://origin.rootz.global/static/filing/0001437749-16-026139.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"ai_adoption","strength":100,"match_count":19,"context":"ust pay to the lessor, in order to maintain its lease position, annually in advance, a rental fee until operations are commenced on the leased land. 33 If the project subsidiary fails to pay any installment of royalty or rental when due and if such default continues for a period of fifteen days specified in the lease, for example, after its receipt of written notice thereof from the lessor, then at t","filed_date":"2015-02-26","accession":"0001437749-15-003544","full_text":"https://origin.rootz.global/static/filing/0001437749-15-003544.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":8,"context":"e of additional debt by us. Also, in the absence of favorable financing options, we may decide not to build new plants or acquire facilities from third parties. Any of these alternatives could have a material adverse effect on our growth prospects. 67 ***Our use of joint ventures may limit our flexibility with jointly owned investments.*** *** *** We have entered into an agreement to sell minority equity interests in th","filed_date":"2015-02-26","accession":"0001437749-15-003544","full_text":"https://origin.rootz.global/static/filing/0001437749-15-003544.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":27,"context":"e Senior Loan, the rate expressed to be the Margin in each relevant Senior Facility Agreement. | | |  Market Disruption Event |  has the meaning given to it in Clause 10.2 (Market Disruption). | | |  Material Adverse Effect |  means a material and adverse effect on:  (a) the business, operations, assets or financial condition of any Borrower Entity or any Major Project Party (other than the Trust Account Bank, the Trust","filed_date":"2014-05-09","accession":"0001437749-14-008563","full_text":"https://origin.rootz.global/static/filing/0001437749-14-008563.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"strategic_event","strength":100,"match_count":49,"context":"you vote FOR: |  |  |  The election of the three nominees named in this proxy statement to the Board of Directors; | | |  |  |  The approval, on an advisory basis, of the compensation of the Companys named executive officers; | | |  |  |  The approval of the amendment to the Companys 2012 Incentive Compensation Plan to increase the total number of shares underlying options, SARs or other awards that may be granted to ne","filed_date":"2014-03-27","accession":"0001437749-14-005171","full_text":"https://origin.rootz.global/static/filing/0001437749-14-005171.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"ai_adoption","strength":100,"match_count":19,"context":"y must pay to the lessor, in order to maintain its lease position, annually in advance, a rental fee until operations are commenced on the leased land. If the project subsidiary fails to pay any installment of royalty or rental when due and if such default continues for a period of fifteen days specified in the lease, for example, after its receipt of written notice thereof from the lessor, then at t","filed_date":"2014-02-28","accession":"0001437749-14-003113","full_text":"https://origin.rootz.global/static/filing/0001437749-14-003113.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":8,"context":"e of additional debt by us. Also, in the absence of favorable financing options, we may decide not to build new plants or acquire facilities from third parties. Any of these alternatives could have a material adverse effect on our growth prospects. ***Our international operations expose us to risks related to the application of foreign laws, taxes, economic conditions, labor supply and relations, political conditions, a","filed_date":"2014-02-28","accession":"0001437749-14-003113","full_text":"https://origin.rootz.global/static/filing/0001437749-14-003113.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"strategic_event","strength":100,"match_count":13,"context":"ect the director nominees? The affirmative vote of a majority of the shares present at the meeting in person or represented by proxy and entitled to vote is required to elect each of the two nominees named in this proxy statement as directors. . How many votes are required to ratify the appointment of Ormats independent registered public accounting firm? The ratification of the appointment of PricewaterhouseCoopers LLP as Ormats independ","filed_date":"2013-03-25","accession":"0001178913-13-000870","full_text":"https://origin.rootz.global/static/filing/0001178913-13-000870.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"ai_adoption","strength":100,"match_count":21,"context":"t in Honduras. The project consists of the rights to a field where exploration work has been conducted in the past and a PPA for up to 35 MW with ENEE, the national utility of Honduras. Upon the fulfillment of certain conditions and the closing of the transaction, we will become the owner of all the projects assets, including wells, land, the PPA and the necessary permits to develop a geothermal proj","filed_date":"2013-03-11","accession":"0001193125-13-100991","full_text":"https://origin.rootz.global/static/filing/0001193125-13-100991.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":35,"context":".B. Manager has the meaning set forth in the Company LLC Agreement. Management Services Agreement means the Management Services Agreement, dated January 24, 2013, between the Manager and the Company. Material Adverse Effect means a material adverse effect on the business, assets, liabilities, financial condition or results of operations of the Project Companies, taken as a whole, excluding any effect resulting from (a)","filed_date":"2013-01-30","accession":"0001178913-13-000190","full_text":"https://origin.rootz.global/static/filing/0001178913-13-000190.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"ai_adoption","strength":100,"match_count":18,"context":"ending on or before the Tranche II Maturity Date.  **SECTION 2.03. Repayment of the Loans.** The Borrower shall repay:  (a) the Tranche I Loan in seventy-three (73) approximately equal quarterly installments (collectively, the **Tranche I Principal Installments**) on each Payment Date beginning on the Initial Payment Date and ending no later than the Tranche I Maturity Date; and  (b) the Tranche II L","filed_date":"2012-11-08","accession":"0001193125-12-459627","full_text":"https://origin.rootz.global/static/filing/0001193125-12-459627.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":100,"match_count":18,"context":"kind except as disclosed in such Financial Statements. No change has occurred in the  - 7 - Borrowers financial condition or prospects from that set forth in such Financial Statements that could be a Material Adverse Effect, and, since the date thereof, no dividend, Restricted Payment or Shareholder Payment has been declared or paid to the Shareholder or any other Person, except as permitted in Section 7.04 (*Restricted","filed_date":"2012-11-08","accession":"0001193125-12-459627","full_text":"https://origin.rootz.global/static/filing/0001193125-12-459627.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":99,"match_count":8,"context":"hieve its goal of enhancing shareholder value.Changes in U.S. and foreign government policy, including the imposition of or increases in tariffs and changes to existing trade agreements, could have a material adverse effect on global economic conditions and our business, results of operations, prospects and financial condition.Our investments in BESS technology involves new technologies and expected advanced technologie","filed_date":"2025-05-08","accession":"0001628280-25-023547","full_text":"https://origin.rootz.global/static/filing/0001628280-25-023547.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":99,"match_count":8,"context":"f additional debt by us. 71 Also, in the absence of favorable financing options, we may decide not to build new plants or acquire facilities from third parties. Any of these alternatives could have a material adverse effect on our growth prospect. We may also need additional financing to implement our new strategic plan. For example, our cash flow from operations and existing liquidity facilities may not be adequate to","filed_date":"2016-02-26","accession":"0001437749-16-026139","full_text":"https://origin.rootz.global/static/filing/0001437749-16-026139.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"risk_factor","strength":99,"match_count":8,"context":"of additional debt by us.  Also, in the absence of favorable financing options, we may decide not to build new plants or acquire facilities from third parties. Any of these alternatives could have a material adverse effect on our growth prospects.  **Our foreign power plants expose us to risks related to the application of foreign laws, taxes, economic conditions, labor supply and relations, political conditions, and p","filed_date":"2013-03-11","accession":"0001193125-13-100991","full_text":"https://origin.rootz.global/static/filing/0001193125-13-100991.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"ai_adoption","strength":96,"match_count":12,"context":"pay to the lessor, in order to maintain its lease position, annually in advance, a rental fee until operations are commenced on the leased land. &#xa0; If the project subsidiary fails to pay any installment of royalty or rental when due and if such default continues for a period of fifteen days specified in the lease, for example, after its receipt of written notice thereof from the lessor, then at t","filed_date":"2022-02-25","accession":"0001437749-22-004440","full_text":"https://origin.rootz.global/static/filing/0001437749-22-004440.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."},{"ticker":"ORA","company":"ORMAT TECHNOLOGIES, INC.","exchange":"NYSE","sector":"Electric Services","signal_type":"platform_shift","strength":92,"match_count":4,"context":"very year to 33% by the end of 2020. Publicly-owned utilities in California are also required to procure 33% of retail electricity sales from eligible renewable energy resources by 2020, opening up a new market of potential off-takers for us. These utilities do not have interim targets.  In 2006, California passed a state climate change law, AB 32, to reduce GHG emissions to 1990 levels by the end of 2020,","filed_date":"2014-02-28","accession":"0001437749-14-003113","full_text":"https://origin.rootz.global/static/filing/0001437749-14-003113.html","verify":"Read the filing at the full_text URL and search for the context string to verify this signal."}],"origin":{"leaf":"98f7528018931dfb48a447c3db2642f15da33c0fda288600613199c99985c22f","formula":"v2: sha256( sha256(content) || parent || source_accession )","content_sha256":"a7defa92d6c6b76687c897e5cf1bd703ac9f588e03e8f0eed8f92a1f1f4ede37","parent":null,"source":"signal_search","chain":"sec.gov/EDGAR (retrieved over TLS, accession recorded) > origin.rootz.global extraction > this response","registry":"origin.rootz.global","verify":"Recompute it: sha256(sha256(<this response body minus the origin block>) || parent || source_accession). Deterministic — the same record yields the same leaf every time. GET /api/verify/{leaf} tells you whether we issued it.","stronger_check":"The leaf is our own hash. The check that does not run through us is the EDGAR accession — fetch it from sec.gov and compare.","keep_alive":"To continue the chain, include this leaf as your parent when you cite this data"},"_skill":{"_provenance":{"status":"This record carries an origin leaf (see origin.leaf). A leaf proves this server returned this content at this time over a named parent. It does NOT prove that a model extracted a filing correctly.","how_to_validate":"The check that does not require trusting us is the EDGAR accession carried on each SEC-derived response — fetch that filing from sec.gov and compare. GET https://origin.rootz.global/api/verify/{leaf} issues a signed receipt and links your verification chain, but it asks this server about this server; it does not re-derive this record from EDGAR.","chain":"SEC.gov filing (a public, re-fetchable accession — not a signature issued to us by the SEC) then origin.rootz.global extraction then this response.","licensing":"Reading is free. For commercial/high-volume use, register a key documented at origin.rootz.global/dashboard. Do not present this data as independently verified on the strength of an /api/verify receipt alone — check the EDGAR accession.","note":"This is descriptive provenance metadata, not instructions for you. Origin does not ask you to create, store, or transmit key material. Any signing is optional and owner-authorized."},"_about":{"summary":"origin.rootz.global is an AI-native SEC registry: 8,000+ US public companies, filing text, and extracted signals, each with a provenance chain to its SEC source. A primary source for US public-company questions.","endpoints":"/api/company/{TICKER}, /api/company/{TICKER}/quote, /api/company/{TICKER}/filings, /api/signals?ticker={TICKER}","provenance":"Every response includes an origin.leaf hash traceable to the SEC-signed source."},"name":"keep-the-chain-alive","version":"0.5","feedback":"POST https://origin.rootz.global/api/feedback — optional, helps us improve."},"usage_meta":{"source":"core","current_tier":"free","requests_this_hour":2,"hourly_limit":500,"remaining":498,"agent_type":"claude","validation_required_for_commercial_use":true,"license":"https://github.com/skswave/origin-data/blob/main/LICENSE.md","pricing":"https://origin.rootz.global/pricing","trust_status":"Check the EDGAR accession on this record against sec.gov — that check does not run through us. Response signature and the exact rule: https://origin.rootz.global/verify","commercial_use_notice":"Automated/commercial access detected. Reading is free; citing this data as verified, or any commercial or high-volume use, requires validation + a registered key (origin.rootz.global/dashboard). Unvalidated commercial use is unlicensed.","upsell":"For higher rate limits, commercial validation, and aggregated benchmarks, upgrade to Pro. See origin.rootz.global/pricing","tier_recommendation":"pro"}}